7.1.B Copy/Monitoring Levels & Grids

Workflow

Demo

Practice Exercise (Optional)

Download Practice File:  Starting Point

  • Use the Copy/Monitor tools to copy the levels from the architectural model into your structural model.
    • Open an elevation view.
    • Open the Copy/Monitor tool and select the linked architectural model.
    • Use the Copy tool to copy each of the levels.
    • Click the Finish checkmark to close the Copy/Monitor tools.
  • Create new structural plan views for the new levels that have been added to the structural model.
    • Open the Plan Views tool and select Structural Plan.
    • Choose each of the new floor levels that have been added to the structural model.
    • Note how the new structural plan views appear in the Project Browser.
  • Use the Copy/Monitor tools to copy the grids from the architectural model into your structural model.
    • Open a plan view.
    • Open the Copy/Monitor tool and select the linked architectural model.
    • Use the Copy tool to copy each of the grids. Try using the Multiple mode to select several grids at a time.
    • Click the Finish checkmark to close the Copy/Monitor tools.
  • Use the Copy/Monitor tools to copy the floors and structural walls from the architectural model into your structural model.
    • Open the default view.
    • Open the Copy/Monitor tool and select the linked architectural model.
    • Use the Copy tool to copy each of the floors from the architectural model.
    • Use the Copy tool to copy the structural walls (around the elevator and stair shafts) into the structural model.
    • Click the Finish checkmark to close the Copy/Monitor tools.

When you have completed this exercise, your model should look like this:

Download FileEnding Point