Design Project 2 | Round 2 Testing & feedback

Journal Entry For
Project 2 - Mini Proposal

Link to Miro (zoom out to see the content)

image
feedback from round 2 testing:
  • UVa proof glass for the pool
  • supports for the room
  • Mention the material for the underground structure
  • Use Geothermal cooling and heating
  • staff to oversee the building and make it safe - promote harmony
  • study/meeting room for one of the underground rooms
  • tinted glass for the pool to protect privacy
  • from Colin: water lift - drain water from the pool to lift the elevator, for the elevator to go back down - have a water recycling machine that purifies the water and pump it back to the pool